The table below shows the results of the 2006
survey carried between August and September 2006. Items identified in the
survey with potential for future savings or further investigation are coloured
orange, items changed are coloured green. This is the first proper survey of
heating since the overall project began. All radiators except the upstairs
bathroom are already fitted with thermostatic valves.
| |
Room/Item |
Original |
Change To |
|
Notes |
| |
|
Draughts/Heat
Loss |
Details |
Date |
|
| |
Lounge |
|
|
| |
Patio Doors (4) |
Double Glazed |
|
|
| |
Window |
Double Glazed |
|
|
| |
Radiator 1 |
On Outside Wall |
Added
Reflective Sheet |
25-11-7 |
|
| |
Radiator 2 |
On Outside Wall |
Added
Reflective Sheet |
25-11-7 |
|
| |
Radiator 3 |
On Outside Wall |
|
Add Reflective Backing |
| |
Radiator 4 |
On Inside Wall |
|
|
| |
Floor |
3/4" Hardwood On Concrete |
|
|
| |
Ceiling |
Below Main Bedroom |
|
|
| |
3 External Walls |
Cavity Wall Insulation |
|
|
|
| |
Hall |
|
| |
Front Door |
Gaps Around
Door |
|
Fit Extra Draught Strips |
| |
Radiator 1 |
On Inside Wall |
|
|
| |
Radiator 2 |
On Inside Wall |
|
|
| |
Floor |
Carpet/Underlay on Concrete |
|
|
| |
Ceiling |
Loft Above Floored |
|
|
|
| |
Main
Bedroom |
|
| |
Window |
Double Glazed |
|
|
| |
Skylight |
Double Glazed |
|
|
| |
Ceiling |
200mm + Wood |
|
|
| |
Radiator 1 |
On Ourside
Wall |
Added
Reflective Sheet |
25-11-7 |
|
| |
Radiator 2 |
On Inside Wall |
|
|
| |
3 External Walls |
Cavity Wall Insulation |
|
|
|
| |
Bedroom
2 |
|
| |
Window |
Double Glazed |
|
|
| |
Ceiling |
150mm Loft
Insulation |
Increased to
350mm |
03-Nov-06 |
Including reflective foil backing |
| |
Floor |
Carpet/Underlay on
Concrete |
|
|
| |
Radiator 1 |
On Outside Wall |
|
|
| |
1 External Wall |
Cavity Wall Insulation |
|
|
|
|
|
| |
Bedroom
3 |
|
|
|
| |
Window |
Double Glazed |
|
|
|
| |
Ceiling |
150mm Loft
Insulation |
Increased
to 350mm |
03-Nov-06 |
Including reflective foil backing |
| |
Floor |
Carpet/Underlay on
Concrete |
|
|
|
| |
Radiator 1 |
On Outside Wall |
|
|
Reflective Backing Fitted |
| |
1 External Wall |
Cavity Wall Insulation |
|
|
|
|
|
|
| |
Bedroom
4 |
|
|
|
| |
Skylight |
Double Glazed |
|
|
|
| |
Ceiling |
Insulated |
|
|
|
| |
Loft Door 1 |
Minimal
Insulation |
|
|
Increase Insulation |
| |
Loft Door 2 |
Minimal
Insulation |
|
|
Increase Insulation |
| |
Radiator 1 |
On Loft Wall |
|
|
Add Reflective Backing |
| |
1 External Wall |
No Insulation |
|
|
Increase Insulation |
| |
2 Walls To Loft |
Minimal
Insulation |
|
|
Increase Insulation |
| |
| |
Workshop |
|
|
|
| |
Ceiling |
Insulated |
|
|
|
| |
2 Walls To Loft |
Minimal
Insulation |
|
|
Increase Insulation |
| |
| |
Stairs
& Landing |
|
|
|
| |
Skylight |
Double Glazed |
|
|
|
| |
Ceiling |
Insulated |
|
|
|
| |
1 Wall To Loft |
Insulated |
|
|
|
|
| |
Kitchen |
|
|
|
| |
Back Door |
Double Glazed & Draught Proofed |
|
|
|
| |
Window |
Double Glazed |
|
|
|
| |
Ceiling |
150mm Loft Insulation |
Increased to 350mm |
03-Nov-06 |
Including reflective foil backing |
| |
Floor |
Tiled |
|
|
Not Sure What To Do? |
| |
Radiator 1 |
On Inside Wall |
|
|
|
| |
Radiator 2 |
On Inside Wall |
|
|
|
| |
3 Outside Walls |
Cavity Wall Insulation |
|
|
|
| |
Central Heating Boiler |
Unbalanced |
Balanced System &
Service |
14-Nov-06 |
|
| |
Meter Cupboard |
Big Hole
Through Cavity Wall |
|
|
Fill Hole |
| |
| |
Downstairs
Bathroom |
|
|
|
| |
Window |
Double Glazed |
|
|
|
| |
Ceiling |
150mm
Loft Insulation |
Increased to 350mm |
03-Nov-06 |
Including reflective foil backing |
| |
Radiator |
On Inside Wall |
|
|
|
| |
Floor |
Wood Laminate On Concrete |
|
|
|
| |
|
|
|
|
| |
Bedroom
5 |
|
|
|
| |
Window |
Double Glazed |
|
|
|
| |
Ceiling |
150mm
Loft Insulation |
|
|
Increase Insulation |
| |
Floor |
Carpet/Underlay on
Concrete |
|
|
|
| |
Radiator |
On Outside Wall |
Added
Reflective Sheet |
25-11-7 |
|
| |
1 Outside Wall |
Cavity Wall Insulation |
|
|
|
| |
| |
Loft |
|
|
|
| |
Hot Water Tank |
Very Well Insulated |
|
|
|
| |
Roof |
No Insulation |
|
|
|
| |
3 Outside Walls |
No Insulation |
|
|
Increase Insulation |
| |
Central Heating Pipes |
Still A Few Some Poorly
Lagged |
|
|
Increase Insulation |
|
| |
Utility
Room & Toilet |
|
| |
Window |
Double Glazed |
|
|
|
| |
Ceiling |
|
|
|
|
| |
Floor |
Tiled Over Insulation |
|
|
|
| |
Radiator 1 |
On
Outside Wall |
|
|
|
| |
3 Outside Walls |
Insulated |
|
|
|
|
| |
Upstairs
Bathroom |
|
| |
Ceiling |
Insulated |
|
|
| |
Windows |
Double Glazed |
|
|
|
| |
1 Outside Wall |
Cavity Wall Insulation |
|
|
|
| |
1 Wall To Loft |
Insulated |
|
|
|
|
|
|
|
|
|
|